Syange Hydropower

Hydropower Station of 183 KW capacity was completed in 2001 (2058 B.S) and ....

   

Khudi Hydropower

Khudi Hydropower project of 4000 KW, located in Khudi, Simpani, Ghanpokhara VDC ...

Nyadi Hydropower Project

  Installed Capacity : 20 MW
Design flow : 7.1 m3/s
Gross Head : 352 metres

Radhi Small Hydropower

  Installed Capacity : 4400 KW
Design flow : 870 Liter/s
Gross Head : 617 metres
  click for details
 

PIPELINE PROJECTS - Nyadi Hydropower Project

 

Nyadi Hydropower Project is a run-of-the-river scheme with the following salient features.

 

Installed Capacity : 20 MW

Design flow : 7.1 m3/s

Gross Head : 352 metres

Annual Energy : 127.3 GWh

Primary : 73.2 GWh

Secondary : 54.1 GWh

Total : 127.3 GWh

Estimated Project Cost : US $ 31.98 million

 

The Nyadi Hydropower Project (NHP) is located on the right bank of Nyadi River, a tributary of the Marsyangdi River. The intake is located 7 km upstream of the confluence with Marsyangdi at Naije, the powerhouse is 3 km downstream from Naije at the village of Tarachowk. The entire project area lies within Bahundada VDC of Lamjung District.

 

In June 1998 LEDCO created a new company-Nyadi Hydropower Limited (NHL) to build, own, and operate NHP. MoU has been signed on Dec. 2006 between Butwal Power Company (BPC) and LEDCO for further development of the project. NHL has planned to commence its construction work after receiving approvals from concerned authority by the end of 2007.

 

 