Syange Hydropower
Hydropower Station of 183 KW capacity was completed in 2001 (2058 B.S) and .... |
| |
|
 |
Khudi Hydropower
Khudi Hydropower project of 4000 KW, located in Khudi, Simpani, Ghanpokhara VDC ... |
|
|
PIPELINE PROJECTS
LEDCO has completed study and design of a number of projects which are ready for implementation. Currently LEDCO is carrying out feasibility studies of some projects in Lamjung District. The projects of which feasibility studies has been completed are Nyadi (20 MW), Radhi (4.4
MW), Dordi (10.3 MW), Midim (3.7 MW)Tatopani (210 KW). The under-construction road between Beshisahar of Lamjung District and Chame on Manang district passes close to Nyadi, Tatopani & Radhi and thus make them accessible for vehicular transport. Also, the road is under-constriction in Dordi reach and other projects located downstream of the same river avail the accessibility to the site. Few more projects have been identified for future study and development.
|
Nyadi Hydropower Project
The Nyadi Hydropower Project (NHP) is located on the right bank of Nyadi River , a tributary of the Marsyangdi River .
Installed Capacity : 20 MW ( Click for details )
|
|
|
Tatopani Mini Hydro Projec
Tatopani Mini Hydro Project is located at Lilibhir of Ghermu VDC of Lamjung District. Tatopani Mini Hydro Project is about 3 km south of Syange power station.
Installed Capacity : 210 KW ( Click for details )
|
|
|
|
Radhi Small Hydropower Project
Radhi Small Hydropower Project is located in Ghermu VDC of Lamjung about 5 km north of the existing Syange power station.
Installed Capacity : 4400 KW ( Click for details )
|
|
|
|
|
|
|
|
 |